Bilenerji, one of the first auto producer companies, established in the years following the legislation of the Act 3096, which allows private sector companies to produce their own energy, put the first co-generation plant of 4.5 MW into operation inside the campus of Bilkent University (Bilkent, Ankara) in 1995.

In November 1999, a combined circuit power plant of 32 MW was added to the existing system. The project, conducted by Foster Wheeler as the main contractor, was received upon the completion of performance and reliability tests in September 2000. The project consists of one gas turbine of 24 MW and one steam turbine of 8 MW.